Log Home Pictures from 1999, Part 3 of 4



The first two pairs of rafters are in place.


By September, all rafters are installed. Not much time left to nail on the OSB sheathing.


The rafters changed the look of the building and provided some interesting lighting effects.


This shows the start of the walkway to the roof. The rails are retired crane mast and booms. The deck is OSB.


Looking down the completed walkway from the commander's chair. The first course of OSB is nailed on the roof. The pickup and trailer can be seen at the bottom of the walkway.


Ellen nailing down OSB.