Log Home Pictures from 2001, Part 1 of 3

The major projects for 2001 were the loft subfloor, interior stud walls, plane and stain the exterior log walls, install the front door, and get a start building the log porch structure.

Andrew in the loft on the scaffolding left from building the gable wall. 1/14/01


Andrew on the new loft subfloor that is nearly completed. 1/14/01


Ellen with lumber for the stud walls stockpiled in the dining room. 1/14/01


The loft subfloor is finished.The stairway will come up directly below the light bulb. 1/25/01


View of the interior stud walls from the bedroom looking toward the dining room. You can see the tub and shower on the right. 4/4/01



2001 Pictures: Part 2 | Part 3



Pictures from other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Go To Home Page

©2003 Paul R. Martin, All rights reserved.