Log Home Pictures from 2001, Part 1 of 3
The major projects for 2001 were the loft subfloor, interior stud walls, plane and stain the exterior log walls, install the front door, and get a start building the log porch structure.

Andrew in the loft on the scaffolding left from building the gable wall. 1/14/01

Andrew on the new loft subfloor that is nearly completed. 1/14/01

Ellen with lumber for the stud walls stockpiled in the dining room. 1/14/01

The loft subfloor is finished.The stairway will come up directly below the light bulb. 1/25/01

View of the interior stud walls from the bedroom looking toward the dining room. You can see the tub and shower on the right. 4/4/01
©2003 Paul R. Martin, All rights reserved.