Log Home Pictures from 2001, Part 1 of 3
Other years: 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
The major projects for 2001 were the loft subfloor, interior stud walls, plane and stain the exterior log walls, install the front door, and get a start building the log porch structure.
Andrew in the loft on the scaffolding left from building the gable wall. 1/14/01
Andrew on the new loft subfloor that is nearly completed. 1/14/01
Ellen with lumber for the stud walls stockpiled in the dining room. 1/14/01
The loft subfloor is finished.The stairway will come up directly below the light bulb. 1/25/01
View of the interior stud walls from the bedroom looking toward the dining room. You can see the tub and shower on the right. 4/4/01





2001 Pictures: Part 2
|
Part 3
©2003 Paul R. Martin, All rights reserved.