Log Home Pictures from 2001, Part 1 of 3
The major projects for 2001 were the loft subfloor, interior stud walls, plane and stain the exterior log walls, install the front door, and get a start building the log porch structure.
Andrew in the loft on the scaffolding left from building the gable wall. 1/14/01
Andrew on the new loft subfloor that is nearly completed. 1/14/01
Ellen with lumber for the stud walls stockpiled in the dining room. 1/14/01
The loft subfloor is finished.The stairway will come up directly below the light bulb. 1/25/01
View of the interior stud walls from the bedroom looking toward the dining room. You can see the tub and shower on the right. 4/4/01





2001 Pictures: Part 2
|
Part 3
©2003 Paul R. Martin, All rights reserved.