Log Home Pictures from 2000, Part 4 of 4


All the roof panels are installed.


The beginning of staining the outside walls. The logs had discolored in the sun and needed a lot of work planing and sanding before they could be stained. The steel scaffold tower provided access to the wall.


Staining the right hand third of the front wall. You can see the jury-rigged scaffolding used to reach the corner.


Staining the rest will have to wait until spring. It's time to move to projects on the inside of the building.


Working on the inside now, the loft floor is started.