Log Home Pictures from 2003, Part 4 of 4

These pictures show the recent projects of finishing the chinking on the outside of the building, and installing windows.


This is the front of the building completely chinked.


This is a close-up of the chinking on the northwest wall.


The northwest wall after it is all chinked. The scaffolding is still in place for the bottom of it, and the last seam is not yet dry.


This is the utility trench in the upper roadway. Two water pipes and two electrical conduits are waiting to be covered up. You can see the new living room window that is installed at this point.


This is the sling used to lift the windows. You can see the clips and small C-clamps at the top corners.


This is the rigging used to lift the big windows. All the details of this rigging are described here.