6/7/07 Here is a view of the first column pad from the back door.

6/12/07 Here Paul is holding the "pinwheel" basis for a column pad form.

6/12/07 Here he is positioning and levelling the pinwheel over the hole in the ground.

6/12/07 The form is almost ready for concrete.

6/12/07 Here the form for the second column pad and its CB66 is ready for concrete.

6/13/07 The first column has been fabricated to fit into the CB66.

6/13/07 Paul is inserting the column into the CB66 on the first column pad.

6/13/07 The first column is installed on its column base.