Log Home Pictures from 2008, Part 5 of 5

8/7/08 The stairway forms are finished and ready for concrete.

8/7/08 Close-up of the riser installed where the rock was chiseled away.

8/25/08 Dave, Bill, John, and Jim ready to pour concrete. You can barely see one of the special stair screeds John showed me how to make.

8/25/08 Dave, John, and Jim filling the upper landing. You can barely see one of the special stair screeds John showed me how to make.

8/25/08 John, Dave, Bill, and Paul on top forms.

8/25/08 Bill and Jim with the filled forms looking down from the top of the stairs.

8/25/08 The year '2008' imprinted in the top riser of the first flight of stairs.

8/26/08 The new stoop and steps with the vault over the electrical conduit going off to the bottom right.

11/5/08 The staircase with the rope handrail looking up from the bottom.

11/5/08 The staircase with the rope handrail looking down from the top.